The first walls go up. The back wall of the treatment room, surgery room, and the laundry room. Along
with the north wall of the laundry. Things should really start moving now.
Framed the inside wall of exam
room 2, xray room and exam
room 3, and the storage room.
Top view of the same walls as
listed in the picture on the left.
Exam room 3 with all four
walls.
West walls of the treatment room
and surgery. One wall still laying
down until we move the doorway .
Installed big 4 x 12 x 18 beam
over head. Only two walls left to
frame.
Pocket door frames installed.
Back half of the building with the
joists up to support the walls and
create the ceiling.
Enclosed last roll up door and side
door. Now we can finish framing
the last two walls.
The last two walls of framing are
now done.
The reception area is now framed.
The view from both sides of the
counter. The area is large enough
to make it nice and comfortable
for the employees as well as the
three and sometimes four dogs
who come to work with Dr.
Brennan. It will be so nice when it
is all done.
All the joist are up which holds the
ceiling. Look at all that wood! Now some
fire blocking and the other
subcontractors can come in to work.
New doors in front for the pet
shop.
This door was moved from the
front of the building to the back in
the utility room for a rear exit.
Dark room in x-ray to
develop the film.